UTFPR Engenharia Eletrica Electric Machines Lab Report
Description
Given the electrical system below and the pertinent information for each element of the system, answer the items considering Sb=100MVA and Vb=138kV on the B01 bus and phase sequence direct:
Image
1) Obtain the equivalent single-phase circuits of positive, negative and zero sequence in PU; (20 points)
2) Obtain the Vab voltage phasors (in volts) for each bus in the informed operational condition; (10 points)
3) Obtain Zbus through the direct method and positive sequence Ybus of the analyzed system; (20 points)
4) List the positive-sequence Th¥nin equivalents of each bar; (10 points)
5) Obtain the frank three-phase short-circuit currents of buses B04 and B05; (10 points)
6) Inform the current phasors (in Ampere) of phases A, B and C that flow from B01 to the power bank transformers, during a frank FT fault on phase A of bus B03; (15 points)
7) Inform the voltage phasors of phases A, B and C (in volts) of the B04 bus, during a frank FT fault on the phase A of bus B01; (15 points)

Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."