UC Project Management Discussion
Description
Assigned Readings:
Chapter 9: Resourcing Projects
Chapter 10: Budgeting Projects
Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.
Also, provide a graduate-level response to each of the following questions:
- Thoroughly define and discuss the four different roles that are assigned in a RACI Chart. Why does at least one person/need to be Responsible for an Activity? Why is it necessary to have only one person assigned Accountability for an activity? What would be the issue if a person was assigned two roles (i.e., Responsible and Accountable or Accountable and Consult)?
Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!

Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."