Answering Discussion Questions (Ch7&8)
Description
Unformatted Attachment Preview
Instructions
The assignment itself is basically what inside the below box. All the information outside the box is
general guidelines and instructions that are needed to complete the assignment .
Assignment:
Discussion (Chapter 7 & 8):
rovide a graduate-level response to the following questions:
1. Your manager recently gave you the responsibility of selecting the next
project, which you will manage as the project manager. There are
currently 3 projects on hold to choose from. Using the weighted
scoring models method, you determine that Project A has a weighted
score of 16, Project B has a weighted score of 14, and Project C has a
weighted score of 17. Which project do you choose and why?
2. Also, Read and reflect on the assigned readings (Ch 7&8). Then post
what you thought was the most important concept(s), method(s),
term(s), and/or any other thing that you felt was worthy of your
understanding in Chapter 7&8.
Reading Materials:
hapters 7 & 8 in the textbook 2oject Management2nd Edition. 2014
ISBN: 978-1-77420-013-1
Author: Adrienne Watt
Chapter 7: Project Initiation
Chapter 8: Overview of Project Planning
ou can access the book for FREE in this link https://opentextbc.ca/projectmanagement
Guidelines:
lease answer the questions directly. No need for an introduction or conclusion.
inimum of 450 Words in length (not including references page)
lease FULLY answer all the questions.
he textbook should be a source listed in your reference section and cited within the body of the
text.
se a minimum of (3) external references.
lease ensure to cite and reference your answers
rovide the page numbers along with in-text Citation.
Example: (Jones, 2018, p.201)
Purchase answer to see full
attachment

Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."